In the short term, the Commission should tailor its proposed damage reporting proposal, as described above, to avoid the reporting of information that is not relevant to the Commission’s purpose of obtaining an accurate picture of the natural gas infrastructure in the event of disasters. For the long term, the Commission should adapt its pipeline reporting to utilize existing NRC/PHMSA procedures and forms.